Key Project Experience / Project Timelines with Clients

2021: Well Services - Gas lift design and implementation, heavy duty slickline, water shutoff.

2021: Crude production, flare gas meter maintenance and field equipment calibration.

2018: Gas lift optimisation solution to enhance asset production.

2021: Valve procurement, calibration, and changeout/installation services.

2021: Integrated Reservoir Studies including seismic interpretation, sequence stratigraphy, seismic interpretation, static modelling, reservoir engineering.

2022: Oracle Primaveral project management portal.

2021: Project management office workflow management portal.

2015: Heavy crude oil asset development study.

2014: Production debottlenecking and HSE consequence management modelling. Flare gas optimisation study in HySYS.

2013: Facility inspection and audit.

2022: Reservoir engineering water disposal study - history match, production optimisation and forecast.

2021: Reservoir engineering study - history match, production optimisation and forecast.

2021: Petrophysical studies.

2020: Integrated field development studies for swamp assets.

2022: Data management and workflow services.

2020: External 3D seismic data reprocessing.

2016: Subsurface data management.

2015: Corporate IT Support Services.

2018: Due Diligence - well placement technical assurance services.

2017: Production accounting and back allocation implementation.

2017: SCADA maintenance and refurbishment.

2010: Field sequence stratigraphy.

2010: Seismic AVO Study.

2010: Field development study.

2015: Corporate IT support services.

2020: Enterprise Project Management Solution

2015: Production accounting and back allocation.

2022: Enterprise Project Management On Prem Solution (Software, Hardware, Services)

2020: Oracle Crystal Ball Application